av无码一区二区大桥久未,国产有奶水哺乳期无码avav,九个美女露脸撒尿嘘嘘视频,亚洲色欲网熟女少妇,国产精品高清一区二区不卡 ,久久综合精品无码av一区二区三区,免费精品国产人妻国语三上悠亚 ,丰满的熟妇岳中文字幕

ICME 3GAHSS: DESIGN & CAE OPTIMIZATION OF LIGHTWEIGHT VEHICLE ASSEMBLY

2018-10-29 10:30:00
LUQIMENG
Original
2752
INTEGRATED COMPUTATIONAL MATERIALS
ENGINEERING APPROACH TO DEVELOPMENT OF
LIGHTWEIGHT 3GAHSS VEHICLE ASSEMBLY
? Principal Investigator: Dr. Lou Hector Jr. (GM)
? 4+ Year Project - Feb. 1, 2013 – Mar. 31, 2017
? $8.5 Million - $6M DOE, $2.5M Cost Share
? Participants:  - 5 universities - 1 national laboratory
- 3 steel companies  - 3 automotive OEMs

- 2 engineering firms


? Two 3GAHSS steels were developed for model validation and design optimization.


? The two 3GAHSS alloys were used for:


Baseline Assembly
Applicants shall establish a baseline vehicle assembly for comparison. The baseline
vehicle assembly description shall include the assembly description, its materials of
construction, and weight. Baseline vehicle components shall have been available on
a similarly configured 2006 or later commercially available Light Duty production
vehicle. Light Duty vehicles include any of the following automobiles: passenger
vehicles, light duty trucks, sport utility vehicles, or passenger vans.

Establish Baseline Assemblies:
1. Select Assemblies
2. Load Cases and Performance Targets (Stiffness, Normal Modes, Crashworthiness)
3. Prepare Detailed FEA Models
4. Cost Model
Design 3GAHSS Assemblies:
1. Design CAD Data
2. Integrate 3GAHSS Assemblies into body structure CAD models
3. Prepare Detailed FEA Models of body structure (LS-DYNA, NASTRAN)
4. Assess Performance and Optimize Design, using 3G (gauge grade and geometry)
optimization, taking advantage of increased formability of 3GAHSS
5. Cost Model
6. Final Report


For crash load cases, initial velocities are reduced so that the new internal energy is 70% of the total internal
energy using standard regulation velocities. This is because the model is for a BIW only (i.e., not a full vehicle
system model). The 30% energy reduction is a judgment based on experience with prior projects.
For the ICME study other sub-systems are represented by
lumped mass only (i.e., sub-system structures are NOT
included in the CAE model). The speed is LOWERED to
reduce the crash energy to achieve body structure intrusions
of similar magnitude of typical Mid-Size Sedan vehicle

CAE Load Cases
1. Side Barrier
2. Side Pole
3. Front Impact
4. Rear Impact
5. Roof Crush
1. Body Static Stiffness (Torsion /
Bending)
2. Body Normal Vibration Modes

Max. mass saving while meeting crash performance, by
substituting 3GAHSS properties
Min. gauge assumed 0.6 mm


Design Iteration #3 (Gauge
Reduction)
?
Max. mass saving while meeting crash
performance, by substituting 3GAHSS
properties
?
Min. gauge assumed 0.6 mm
Design Iteration #6 (Combined
parts)
?
Rocker inner combined parts to increase
joint stiffness






? Objective
? Mass Optimization
? Constraint
? Baseline crash and NVH targets
? Variables
? 62 Morphing points , 32 Thickness
variables, 32 Material Variables
? Job time estimate for EDAG cluster (480 CPU)
? 4.2 month @ 100% cluster utilization for
15 iterations, 189 designs per load-
case 19,845 runs for 15 iterations
? Software used
? LSOPT, LSDYNA -ICME (Explicit and
Implicit)
? Beta - ANSA ;

? CAE 3G Optimization required several ‘scripts’ for running on the HPC – Peregrine, to transport data between EDAG & HPC
? Proposed number of cores based on wall clock time
? Option 3 was approved to run on Peregrine HSC at NREL





? What it is:
— An objective way to compare technologies, designs or manufacturing methods
— An analysis of manufacturing, equipment, tooling, labor, material, and energy costs
— A process to identify cost drivers
— A method to integrate piece cost, tooling cost and capital investment.
? What it isn’t:
— A precise method to obtain commercial price
— A business case
— An analysis of non-manufacturing overhead, such as prototype costs, logistics,
engineering and development costs
? ICME Project Specific Assumption
The cost estimates used are not specific to any OEM and are based on industry
estimates. Specific OEMs will have varying estimates that include (but not limited to)
manufacturing flexibility, safety safe-guards, regional impacts, and vehicle variant
manufacturing strategy etc.

Assembly layout used to determine assembly
costs based on:
? Number of assembly stations
? Number of spot welding robots
? Complexity of assembly station
? Assembly cycle time
? Foot print of assembly station
? Labor requirements per assembly station





Write a Comment
Ten minus Two =
Comment will be posted after it is reviewed.
QR Code
主站蜘蛛池模板: 18禁裸男晨勃露j毛网站 午夜成人片在线观看免费播放 无码福利日韩神码福利片 欧美重口另类在线播放二区 亚洲精品一区国产欧美 久久综合九色综合国产 狠狠色婷婷久久一区二区 亚洲色大成成人网站久久 国产欧美在线亚洲一区 男人av无码天堂 久久精品中文字幕无码 婷婷亚洲天堂影院 亚洲国产精品不卡av在线 免费国产乱理伦片在线观看 亚洲精品99久久久久久欧美版 亚洲一区二区三区四区五区黄 国产午夜无码片在线观看网站 国产人妻人伦精品无码麻豆 精品一区二区三区免费播放 国产三级韩国三级日产三级 久久人人爽av亚洲精品 亚洲精品一区国产欧美 亚洲精品无码久久久影院相关影片 精品午夜国产福利观看 男女啪啪免费观看无遮挡 人摸人人人澡人人超碰手机版 国产黄三级高清在线观看播放 国产网红主播精品一区 99热精品久久只有精品 成熟女人特级毛片www免费 狼友网精品视频在线观看| 成人无码午夜在线观看| 免费无码成人av片在线| 亚洲国产成人综合一区二区三区| 国精品午夜福利视频| 久久香蕉国产线看观看亚洲小说| 日本亚洲欧美综合在线| 国产aⅴ人妻互换一区二区| 精品国产午夜肉伦伦影院| 精品国产小视频在线观看| 久久r999热精品国产首页|